DriSteem Vapor-Logic Instalační příručka Strana 68

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 80
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 67
Page 66 DRI-STEEM GTS Humidifier Installation, Operation, and Maintenance Manual
M a i n t e n a n c e : G T S - D I m o d e l s
( c o n t i n u e d )
W A R N I N G !
When servicing controls, before
disconnecting, label all areas. Wiring errors
can cause explosion or fire, resulting in
severe bodily injury, death, or significant
property damage.
Inspection
1. Annually (also recommended when maintenance is performed)
All safety devices in the control circuit should be cycled on
and off to verify they are functioning. These include:
High limit switch
Airflow proving switch
Low water cutoff switch
Redundant low water cutoff switch
Inspect tank and gaskets for leaks.
Verify that the float valve is closing off. If the float valve will
not shut off, there may be particulate on the valve seat, or the
EPDM seat may be worn and in need of replacement.
As long as mineral-free water is used in the GTS, no cleaning
or flushing of the humidifier should be necessary.
2. Seasonally (or as required, depending on water quality)
Inspect blower motor. Since a lubrication port is not provided,
lubrication is not required.
Remove dust — Using a vacuum, remove all dust from areas
around the motor, vent fan(s), and louvers that allow air to
the shaded area.
3. Off-season maintenance
Perform a complete inspection of the following:
Float valve
Low water cutoff switch
Redundant low water cutoff switch
Humidifier tank and gaskets
Heat exchanger
Drain humidifier tank and rinse.
After inspection, the humidifier should remain empty until
humidification is required.
mc_052808_1730
Maintenance
Zobrazit stránku 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 79 80

Komentáře k této Příručce

Žádné komentáře