Page 46 DRI-STEEM GTS Humidifier Installation, Operation, and Maintenance Manual
Assembly and installation instructions for a Rapid-sorb installed
with header outside the duct (horizontal airflow)
1. Locate and cut the holes in the ductwork for the dispersion
tubes. Use the L-bracket as a template to locate the holes on the
duct floor.
2. Temporarily, loosely suspend or support the header below the
final location the vertical balance point of the dispersion
tube length dictates where the header should be suspended or
supported temporarily.
3. Mount the dispersion tubes to the header with the provided
connector, either a slip coupling or a hose cuff.
When installing slip couplings for 1½" (DN40) dispersion
tubes, take care not to shear the O-rings.
Set the slip coupling on the header stub or dispersion tube so
the O-ring is resting on the face of the tubing.
Rotate the slip coupling as you push it on to the tubing.
The O-rings are lubricated at the factory. If additional
lubrication is necessary, DO NOT use a petroleum-based
lubricant.
4. Position the flange of the L-bracket so it is upstream of the
tubes when the assembly is raised and fastened into position.
Fasten the L-bracket to the end of the dispersion tubes with the
provided bolt, lock washer, and flat washer.
D i s p e r s i o n : R a p i d - s o r b ( c o n t i n u e d )
OM-1214
Figure 46-1:
Rapid-sorb installed in a horizontal airflow with header outside the duct
GTS humidifier
6" (152 mm)
Duct
Pitch header toward drain
1/8"/ft (1%)
5" (127 mm)
Airflow
Dispersion tube
Slip coupling or hose cuff
90° long sweep or
two 45° elbows
Pitch*
Position L-bracket so that flange is upstream of
dispersion tubes. This drawing shows the L-bracket
positioned for airflow back to front
Support bracket
Vapor hose,
tubing, or pipe
¾" pipe thread
(DN20) condensate drain
¾" (DN20) copper
1" (25 mm) air gap
Secure and seal
escutcheon plates
Open drain required.
Locate air gap only in spaces with adequate
temperature and air movement to absorb flash
steam, or condensing on nearby surfaces may
occur. Refer to governing codes for drain pipe
size and maximum discharge water temperature.
Point tubelets (steam orifices)
perpendicular to airflow
Note:
* Pitch vapor hose, tubing, or
pipe toward Rapid-sorb:
– 2"/ft (15%) when using
vapor hose
– 1/8"/ft (1%) when using
tubing or pipe
More on next page
Stainless Steel Support
by DRI-STEEM
Installation
Zobrazit stránku 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 79 80

Komentáře k této Příručce

Žádné komentáře