DRI-STEEM GTS Humidifier Installation, Operation, and Maintenance Manual • Page 53
After the system is installed and connected to gas, electrical, water
supplies, and controls, you can begin start-up procedures.
1. Verify that the GTS humidifier, controls, piping, electrical
connections, steam supply, and dispersion unit(s) are installed
according to the following:
• Installation instructions in this manual
• Vapor-logic4 Installation and Operation Manual
– Installation section
– Installation checklist
• Ladder style wiring diagram (shipped inside unit)
• External connections wiring diagram (shipped inside unit)
• Gas connection instructions in this manual
• Mounting instructions in this manual
• All governing codes
2. Piping (gas)
• Verify that the gas type supplied to the humidifier matches
the unit nameplate label.
• Verify that all field and humidifier gas piping has been tested
for leaks. (Soap and water are not recommended near gas
valves.)
Piping (steam, drain, water supply)—Verify that all piping
connections have been completed as recommended and that
water pressure is available.
3. Electrical—Verify that all wiring connections have been made
in accordance with all governing codes and the GTS wiring
diagrams.
4. Controls—Before proceeding with start-up and operation,
verify that all control wiring has been completed as specified
and required for correct and safe operation of the GTS
humidifier. Refer to the Vapor-logic4 manual that was enclosed
with the product shipment.
S t a r t - u p p r o c e d u r e
Note:
The
Vapor-logic4 Installation and Operation
Manual
is a comprehensive operation
manual. Refer to it for information regarding
the following features:
• Keypad display setup and menu
information
• Control input signals and functions
• Drain, flush, and skim features
• Safety features
• Alarm screens and fault messages
The Vapor-logic4
manual was shipped
with your humidifier. Additional copies
can be viewed, printed, or ordered at
www.dristeem.com
W A R N I N G !
Only qualified electrical and gas personnel
should perform the start-up procedure.
More on the next page ▶