Page 48 DRI-STEEM GTS Humidifier Installation, Operation, and Maintenance Manual
Assembly and installation instructions for a Rapid-sorb installed
with header inside the duct (horizontal airflow)
1. Locate and cut the holes in ductwork or air handler for steam
header penetration, condensate drain piping, and header support
bracket fastener. Allow 1/8"/ft (1%) header pitch toward the
support bracket when you drill the hole for the header support
bracket fastener.
2. Loosely fasten the header in place.
3. Rotate the header 90° so the header stubs point horizontally in
the duct.
When installing in an air handler, the rotation of the header
is often less than 90°. Typically, due to the condensate drain
piping requirements, the header can be set on the floor of the
air handler, assembled in the vertical position, and then raised
and mounted in place.
4. Mount the dispersion tubes on the header with the slip
couplings or hose cuffs.
When installing slip couplings for 1½" (DN40) dispersion
tubes, take care not to shear the O-rings.
Set the slip coupling on the header stub or dispersion tube so
the O-ring is resting on the face of the tubing.
More on next page
D i s p e r s i o n : R a p i d - s o r b ( c o n t i n u e d )
OM-1213
Figure 48-1:
Rapid-sorb installed in a horizontal airflow with header inside the duct
6" (152 mm)
Point tubelets (steam orifices)
perpendicular to airflow
Duct
Vapor hose,
tubing, or pipe
GTS humidifier
Airflow
Dispersion tube
Slip coupling or hose cuff
90° long sweep or
two 45° elbows
Support bracket
5" (127 mm)
¾" pipe thread
(DN20) drain
¾" (DN20) copper
1" (25 mm) air gap
Open drain required.
Locate air gap only in spaces with adequate
temperature and air movement to absorb flash
steam, or condensing on nearby surfaces may
occur. Refer to governing codes for drain pipe
size and maximum discharge water temperature.
Position L-bracket so that flange is upstream
of dispersion tubes. This drawing shows the
L-bracket positioned for airflow back to front
Pitch header
toward drain
1/8"/ft (1%)
Secure and seal
escutcheon plate
Pitch*
Note:
* Pitch vapor hose, tubing,
or pipe toward Rapid-sorb:
2"/ft (15%) when
using vapor hose
1/8"/ft (1%) when
using tubing or pipe
Stainless Steel Support
by DRI-STEEM
Installation
Zobrazit stránku 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 79 80

Komentáře k této Příručce

Žádné komentáře