DriSteem Vapor-Logic Instalační příručka Strana 2

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 80
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 1
ATTENTION INSTALLER
Read this manual before installing.
Leave manual with product owner.
DRI-STEEM technical support
800-328-4447
Where to find more information
On our Web site:
The following related documents can be
viewed, printed or ordered from our web
site, www.dristeem.com
Catalogs (include dispersion nonwetting
distance graphs):
GTS
®
Ultra-sorb
®
Installation, Operation, and Maintenance
manuals:
Ultra-sorb
Vapor-logic
®
4 (includes sensor
placement recommendations and
troubleshooting information)
DRI-STEEM Design Guide
(includes steam
loss tables and general humidification
information)
In Dri-calc:
Dri-calc
®
is our humidification system
sizing and selection software, which can be
ordered at www.dristeem.com.
Included in Dri-calc:
A comprehensive library of installation
guide documents, including:
Rapid-sorb installation instructions
for vertical airflows
Recommended dispersion placement
within a duct or air handler
Recommended sensor placement
Or call us at 800-328-4447
While obtaining documents from our web
site or from Dri-calc is the quickest way to
review our literature, we will also mail to
you any literature you need.
I m p o r t a n t : Troubleshooting information for this humidifier is located
in the Vapor-logic4 Installation and Operation manual shipped with your
humidifier. If you do not have this manual, go to the literature section at
www.dristeem.com to download or order a copy.
European models
The DRI-STEEM GTS Gas-to-Steam Humidifier has been certified
for compliance with harmonised European directives concerning
gas appliances, low voltage, and emission (Gas Appliance Directive
90/396/CEE). Testing was carried out by the Canadian Standards
Association; the notifying body is AFNOR in France, which is a
recognized authority by the European bodies and the DTI in the
United Kingdom.
Installation must conform to the requirements of the National Gas
Safety (Installation & Use) Regulations.
Zobrazit stránku 1
1 2 3 4 5 6 7 ... 79 80

Komentáře k této Příručce

Žádné komentáře