VAPORSTREAM INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Notes:
Locate air gap only in spaces with adequate temperature and air movement to absorb flash
steam; otherwise, condensation may form on nearby surfaces. Refer to governing codes for
drain pipe size and maximum discharge water temperature.
Support steam hose so there are no sags or low spots.
Dashed lines indicate provided by installer.
DC-1166
Vaporstream humidifier
Open drain required. See first note below.
¾" (DN20)
Tubing or pipe drip tee, by installer.
DriSteem part numbers for 304 stainless steel
in-line tees:
1½" diameter (DN40): No. 162710
2" diameter (DN50): No. 162712
1" (25 mm) air gap
8" (200 mm) minimum
6" (150 mm) minimum
To dispersion assembly
Insulate tubing and hard pipe
to reduce steam loss
90° long sweep or two 45° elbows
Obstruction
Pitch
INSTALLATION
Drip tee installation
Install a drip tee as shown in Figure 40-1 when:
Humidifier is mounted higher than the dispersion assembly,
Interconnecting hose or piping must go over an obstruction, or
Interconnecting piping runs are long.
Important: Steam hose must be supported to prevent sagging or low spots.
Dispersion:
FIGURE 40-1: DRIP TEE INSTALLATION (PIPING OVER AN OBSTRUCTION)